Construction Updates

To sign up for email notifications of these weekly updates, click Notify Me and select “Construction Updates.”

If you have any questions throughout construction season, please email Engineering@coonrapidsmn.gov or call 763-767-6479. 

City offices will be closed Monday, September 2 in observance of Labor Day.

Street Reconstruction Project 19-1 – 4 miles of residential streets

The Contractor for this project is North Valley, Inc. The Contractor's main contact is Herb Thielbar, who can be reached at 763-274-2580 (office) or 612-716-4214 (cell). Zach Pfieffer is the City’s full-time project inspector, and can be contacted any time to respond to specific questions or concerns. Zach can be reached at 763-767-6431 (office) or 612-710-8243 (cell).

Work planned for the week of September 3 includes utility replacements and curb installation on streets south of and including 131st Avenue from the bridge over Coon Creek west to Crooked Lake Boulevard. Driveway replacements and boulevard restorations are also planned for Area 3 streets located south of 131st Avenue.

Curb removals and utility/curb replacements will continue on Area 3 streets north of 131st Avenue and east of Coon Creek. Areas 1 and 2 are both complete.

Street Reconstruction Project 19-2 – 2.3 miles of MSA streets (Foley Boulevard from 115th Avenue to 124th Avenue, Wedgewood Drive from Main Street to Round Lake Boulevard, Olive Street from 121st Avenue to Main Street) 

The Contractor for this project is Park Construction. The Contractor's main contact is Dan Bodza, who can be reached at 612-248-7760 (cell). Rene Garcia (612-360-4707) with Park Construction is the Contractor point of contact for watermain pipe replacements. Jon Halter with Hakanson Anderson is the City’s full-time project inspector, and can be contacted any time to respond to specific questions or concerns. Jon can be reached at 612-282-0725 (cell).

Work planned for the week of September 3 includes sod installations on Olive Street from 123rd Avenue to Main Street. Work on the east side of Foley Boulevard includes concrete removals, as well as the Sand Creek culvert replacements described below. Utility replacements will continue on Wedgewood Drive next week.

Replacement of the Sand Creek culverts located underneath Foley Boulevard between 117th and 118th Avenues is planned to begin next week. To accommodate the work, Foley Boulevard will be closed at the Sand Creek crossing south of 118th Avenue. A posted detour will be in place from Northdale Boulevard to 121st Avenue via University Avenue (local access will be maintained). The closure is expected to last until September 30, weather permitting. 

Street Reconstruction Project 19-3 – 3.3 miles of residential streets 

The Contractor for this project is Douglas-Kerr Underground, Inc. The Contractor's main contact is Ryan Kerr, who can be reached at 320-679-8937 (office) or 320-515-0046 (cell). Jason Huebscher is the City’s full-time project inspector, and can be contacted any time to respond to specific questions or concerns. Jason can be reached at 763-767-6570 (office) or 612-709-2704 (cell).

Work during the week of September 3 will include concrete driveway apron reestablishment on streets within the Phase 1B area (Bridgewater neighborhood consisting of Alder Street, Butternut Street, Cottonwood Street, 116th Avenue, 116th Lane, and 117th Avenue). Boulevard restorations and irrigation system repairs will continue within this area.

Irrigation repairs will continue on the west side (southbound direction) of Springbrook Drive, and topsoil will be placed in advance of turf restoration.

Utility replacements should be completed on Mississippi Boulevard between Hanson Boulevard and Ibis Street next week.

Along Flora Street north of 109th Lane (adjacent to the Coon Rapids Ice Center), final work on the watermain system extension will take place, utility restorations will continue, and curb replacements may occur.

Trail Reconstruction Project 19-9 – Erlandson Park Pedestrian Bridge & Dahlia Park Culvert Installation 

The Contractor for this project is Blackstone Contractors. The Contractor's main contact is Brooks Duesterhoeft, who can be reached at 763-291-7728 (office) or 763-267-9411 (cell). Hafedh Hlel is the City’s project engineer/inspector, and can be contacted any time to respond to specific questions or concerns. Hafedh can be reached at 763-767-6412 (office) or 763-339-6128 (cell).

Work during the week of September 3 includes final restorations for the Erlandson Park Pedestrian Bridge and Dahlia Park Culvert installations.

Trail Reconstruction Project 19-11 – Wedgewood Trail, Nelson Park Trails, and Trackside Park Trails 

The Contractor for this project is Northwest Asphalt. The Contractor's main contact is John Hamers, who can be reached at 952-445-1003 (office) or 952-292-8471 (cell). Hafedh Hlel is the City’s project engineer/inspector, and can be contacted any time to respond to specific questions or concerns. Hafedh can be reached at 763-767-6412 (office) or 763-339-6128 (cell).

This project is substantially complete. Minor turf restorations will continue next week. 

Port Riverwalk Development Project 19-12 – Grading, Erosion Control, and Turf Establishment 

The Contractor for this project is North Pine Aggregate. The Contractor's main contact is Jake Jensen, who can be reached at 651-888-7907 (office) or 612-770-6682 (cell). Ron Sample is the City’s project inspector, and can be contacted any time to respond to specific questions or concerns. Ron can be reached at 763-767-6427 (office) or 763-257-3874 (cell).

Work during the week of September 3 includes continued removals and mass grading for the new Port Riverwalk development.

Anoka County Project – Hanson Boulevard (CSAH 78) Railroad Bridge Overpass

Hanson Boulevard is a County road in Coon Rapids (north of Coon Rapids Boulevard). The County’s Contractor for this project is C.S McCrossan. Harry Grams is the County’s Construction Supervisor, and can be contacted at 763-324-3114.

To view the County’s updates and subscribe to email notifications, click here: http://www.anokacounty.us/1578/Construction-Weekly  

Watch our Videos!   

Watch the City’s street reconstruction videos to learn more about the process! The first addresses frequently asked questions, and the second demonstrates what the process will look like in a Coon Rapids neighborhood.

View them here: www.coonrapidsmn.gov/843/Street-Reconstruction