Street Reconstruction Project 18-1 – 4.7 miles of residential streets on the east and west sides of Foley Boulevard, from near Highway 10 to south of Northdale Boulevard
The Contractor for this project is North Valley, Inc. The Contractor's 24-hour emergency contacts are Herb Thielbar at 612-716-4214 and Jeff Wunderlich at 612-282-5039. Jason Huebscher is the City’s full-time project inspector, and can be contacted any time to respond to specific questions or concerns. Jason can be reached at 612-709-2704 (cell).
During the week of August 27, the Contractor plans to continue asphalt driveway apron and boulevard restorations on streets within Area 4 (streets located generally east of Foley Boulevard and south of Northdale Boulevard).
New asphalt paving is anticipated on segments of 107th Lane and 108th Avenue west of Dogwood Street, Cottonwood Street between Northdale Blvd. and Butternut Street, and possibly segments of 111th Avenue and Dogwood Street (all within Area 4).
|
|
|
|
Street Reconstruction Project 18-2 – 4 miles of residential streets south of Coon Rapids Boulevard near Round Lake Boulevard and streets between Northdale Boulevard and Crooked Lake Boulevard
The Contractor for this project is Northwest Asphalt, Inc. The Contractor's 24-hour emergency contacts are John Lenarz at 952-220-0684 and John Hamers at 952-292-8470. Zach Pfieffer is the City’s full-time project inspector, and can be contacted any time to respond to specific questions or concerns. Zach can be reached at 612-710-8243 (cell).
During the week of August 27, the Contractor plans to continue irrigation, driveway, and boulevard restorations on streets within Area 3 (Pheasant Ridge Drive, 114th Lane, 115th Avenue, Silverod Street, Undercliff Street, and Coon Rapids Boulevard Service Road).
|
|
|
|
Egret Boulevard Watermain Reconstruction Project 18-7 – Watermain replacement along Egret Boulevard from Coon Rapids Boulevard Service Road to 99th Avenue
The Contractor for this project is Dave Perkins Contracting, Inc. The Contractor's 24-hour emergency contacts are Rene Perkins at 612-363-6459 and John Acman at 320-224-0048. Ron Sample is the City’s full-time project inspector, and can be contacted any time to respond to specific questions or concerns. Ron can be reached at 763-257-3874 (cell).
As work was progressing on this project during the week of July 23, there was a delay with the northernmost pipe connection on Egret Boulevard near the City well station. To resolve this connection delay, it was determined that additional custom parts which must be fabricated and shipped to the job site are required. Based on production and delivery of the parts, remaining watermain connection work and surface restorations are expected to be completed during the next several weeks.
|
|
|
|
Sidewalk Expansion Improvement Project 17-19 – Construction of miscellaneous sidewalk segments along Coon Rapids Boulevard, Dogwood Street, and 115th Avenue
The Contractor for this project is Ti-Zack Concrete, Inc. The Contractor's 24-hour emergency contacts are Jim Leary at 612-309-4260 and Cory Johnson-Roe at 507-262-0913. Alex Wiebe is the City’s full-time project inspector, and can be contacted any time to respond to specific questions or concerns. Alex can be reached at 612-716-3141 (cell) or 763-767-6412 (office).
The Contractor will work on sidewalk segments planned for construction at 2121 Coon Rapids Boulevard (Neil’s Auto Body) and 298 Coon Rapids Boulevard south of 93rd Avenue during the week of August 27. By the end of next week, boulevard restorations along Dogwood Street and 115th Avenue will be complete.
|
|
|
|
Miscellaneous Park and Trail Improvement Project 18-6 – Reconstruction of segments of Prairie Oaks Park, Burl Oaks Park, and Vineyards Park trails
The Contractor for this project is North Valley, Inc. The Contractor's 24-hour emergency contact is Herb Thielbar at 612-716-4214. Alex Wiebe is the City’s full-time project inspector, and can be contacted any time to respond to specific questions or concerns. Alex can be reached at 612-716-3141 (cell) or 763-767-6412 (office).
During the week of August 27, the Contractor will continue restoration activities along the Burl Oaks and Prairie Oaks trail segments. Paving operations will take place on the Vineyards Park trail system.
|
|
|
|
Riverwalk Sanitary Sewer Rehabilitation Project 17-28 – Lining of 42-inch diameter City sewer pipe and associated manhole structures within the Riverwalk re-development area
The Contractor for this project is Lametti & Sons, Inc. The Contractor's 24-hour emergency contacts are Jeffrey VanHoven at 651-248-3344 and David Lovas at 651-208-6517. Mike Ostendorf is the City’s Consultant designer, and can be contacted at 651-280-0679 to respond to any specific questions or concerns.
During the week of August 27, the Contractor will continue setting up the temporary bypass network necessary to re-route sewer flows for the planned 42-inch sewer pipe lining.
|
|
|
|
Anoka County Project – Hanson Boulevard (CSAH 78) Railroad Bridge Overpass
Hanson Boulevard is a County road in Coon Rapids (north of Coon Rapids Boulevard). The County’s Contractor for this project is C.S McCrossan. Harry Grams is the County’s Construction Supervisor, and can be contacted at 763-862-4250.
A new watermain connection will be installed as part of the project, and work is anticipated to begin next week. The new pipe will provide continued water service to a residential neighborhood east of Hanson Boulevard during the grade separation project, as well as a permanent looped connection to that neighborhood into the future. Residents in the areas of 107th Avenue between Hummingbird and Killdeer Streets and 108th Lane west of Hanson Boulevard will be notified in advance of any temporary water shutoffs during the work.
To view the County’s updates and subscribe to email notifications, click here: http://www.anokacounty.us/1578/Construction-Weekly
|
|
|
|
Watch our Videos!
To learn more about the street reconstruction process, watch the City’s new videos! The first addresses frequently asked questions, and the second demonstrates what the process will look like in a Coon Rapids neighborhood.
Visit our website to view them: www.coonrapidsmn.gov/843/Street-Reconstruction
|
|
|
|
|
|
|