Street Reconstruction Update

To sign up for email notifications of these weekly updates, click Notify Me and select “Street Reconstruction Updates.”

Anoka County Project – Foley Boulevard Reconstruction (Egret to Northdale)

Foley Boulevard is a County road in Coon Rapids. The County’s Contractor for this project is Forest Lake Contracting, Inc. Harry Grams is the County’s Construction Supervisor, and can be contacted at 763-862-4250.

To view the County’s updates and subscribe to email notifications, click here: http://www.anokacounty.us/1578/Construction-Weekl

Dakotah Street Reconstruction adjacent to Mercy Hospital

Dakotah Street from Coon Rapids Boulevard to approximately 600-feet south is being reconstructed in conjunction with the Mercy Hospital expansion. The Contractor is Bolander Construction.
 
At this time, the road is fully open to traffic and completion of the last lift of asphalt pavement will occur on Saturday, August 19th.  Restoration activities continued this week with the placement of topsoil and minor grading adjacent to the new roadway and sidewalk. Turf/seeding will likely occur the week of August 21st.

Street Reconstruction Project 17-1 – Neighborhood Streets between Dogwood Street and University Avenue south of Egret Boulevard and north of 101st Avenue

The Contractor for this project is Park Construction Company. The Contractor's 24-hour emergency contact is Nate at 612-360-9295. Jason Huebscher is the City’s full-time project inspector, and can be contacted any time to respond to specific questions or concerns. Jason can be reached at 612-709-2704 (cell).

For the week of August 21, curb installation is scheduled on 103rd Ave, 101st Lane, and Cottonwood and Butternut Streets from 101st to 102nd Avenues. Concrete driveway aprons will also be installed on these streets at the same time. Paving is planned for Monday on Dogwood St. from 101st Ave to 102nd Ln and 103rd Ave to Egret as well.

Street Reconstruction Project 17-2 – 101st Avenue, 121st Avenue, and Shenandoah Boulevard

The Contractor for this project is Park Construction Company. The Contractor's 24-hour emergency contact is Nate at 612-360-9295. Andy Evans with Hakanson Anderson is the full-time project inspector, and can be contacted any time to respond to specific questions or concerns. Andy can be reached at 612-716-3788 (cell).

During the week of August 21, watermain and storm sewer installation will wrap up early in the week on 101st Avenue. The Contractor will then begin prepping the westbound lanes for curb installation. Concrete work will also be completed on Shenandoah Blvd during the week.

Street Reconstruction Project 17-3 – Local Streets within Burl Oaks Neighborhoods 

The Contractor for this project is North Valley. The Contractor's 24-hour emergency contact is Rodney Riemann at 612-328-7536. Ron Sample is the City’s full-time project inspector, and can be contacted any time to respond to specific questions or concerns. Ron can be reached at 763-257-3874 (cell).

During the week of August 21, the Contractor will be prepping the roadways in the phase 2 area (Ilex St, 123rd Ave., and 120th Ln – adjacent to Foley Blvd, and the Juniper St. cul-de-sac) for paving, with paving to be completed the week of August 28th. The phase 3 area (Cottonwood, Dogwood, Flintwood, Ilex, Holly, and Juniper – adjacent to 121st Ave.) is scheduled for driveway and curb removals.

Street Reconstruction Project 17-4 – Various Local Streets throughout Coon Rapids 

The Contractor for this project is North Valley. The Contractor's 24-hour emergency contact is Rodney Riemann at 612-328-7536. Zach Pfieffer is the City’s full-time project inspector, and can be contacted any time to respond to specific questions or concerns. Zach can be reached at 612-710-8243 (cell).

For the week of August 21, Turf establishment (hydroseeding) will be conducted on 93rd Ave and Ln.  Curb installation is scheduled on 127th Ln and Juniper St.

Please note: Due to adverse weather this week, the Contractor will be paving 93rd Ave and Ln. on Saturday, August 19.

Trail Construction Project 17-10 – Coon Rapids Boulevard Extension

The Contractor for this project is Forest Lake Contracting. The Contractor's 24-hour emergency contact is Wade Kosman at 651-248-4707. Alex Wiebe is the project inspector, and can be contacted any time to respond to specific questions or concerns. Alex can be reached at 612-716-3141 (cell).

For the week of August 21, the Contractor will be performing curb repairs, installing pedestrian ramps, placing topsoil and performing minor grading adjacent to the trail in anticipation of turf establishment. Fencing work may also take place this week, depending on the weather and completion of turf restoration activities.

Trail Construction Project 17-11 – Coon Rapids Boulevard / Egret Boulevard Trail

The Contractor for this project is Barber Construction. The Contractor's 24-hour emergency contact is Jerry Barber at 612-709-9227. Alex Wiebe is the project inspector, and can be contacted any time to respond to specific questions or concerns. Alex can be reached at 612-716-3141 (cell).

For the week of August 21, the Contractor will be installing pedestrian ramps, gravel base and paving the remainder of the trail segments.