Construction Updates

2021 Construction is Underway!

For more information on City street reconstruction projects and to view project locations and property owner mailings, visit: www.coonrapidsmn.gov/2021projects.

If you have any questions about street reconstruction projects, you may always email Engineering@coonrapidsmn.gov or call 763-767-6479.

To sign up for email notifications of these weekly updates, click Notify Me and select “Construction Updates.”

Coon Rapids Boulevard Pedestrian Bridge Rehabilitation Project 18-13A

This pedestrian bridge is located northwest of the intersection of Coon Rapids Boulevard and Coon Rapids Boulevard Extension just southeast of Zilla Street. Please direct all questions and concerns regarding this construction project to the City of Coon Rapids Project Manager, Mark Hansen, who can be reached at 763-767-6465.

This project is now substantially complete. The City will repaint the metal bridge railings, bollards, banner poles, bike racks, and benches located in this area under a separate contract within the next few weeks.

The Metropolitan Council Environmental Services (MCES) is currently rehabilitating its lift station (L34) adjacent to this City-owned pedestrian bridge along Coon Rapids Boulevard Extension. For MCES project schedule and contact information, please visit: https://metrocouncil.org/Wastewater-Water/Projects/Sewer-Planning-Construction-Updates/Projects/Coon-Rapids-L34-805560.aspx

2021 Street Reconstruction Project 21-1 – 3.0 miles of local streets (from 127th Avenue north of 130th Lane between Shenandoah Boulevard and Hanson Boulevard plus Bluebird Circle north of 121st Avenue) 

The Contractor for this project is New Look Construction. The Contractor’s main contact is Adam Pohlkamp at 320-980-3637. The City’s full-time project inspector is Zach Pfieffer, who can be contacted any time to respond to specific questions or concerns. Zach can be reached at 763-767-6431 (office) or 612-710-8243 (cell).

Work next week includes concrete curb and gutter and driveway apron area removals in Area 2 (streets including 128th Avenue, Nightingale Street, Jay Street, and 129th Lane). This process will take place throughout the entire week. Driveways will be ramped with gravel to maintain access throughout.

New concrete curb and gutter installations are planned to begin in Area 2 on July 6 – this avoids on-street parking restrictions over the 4th of July holiday weekend during the concrete curing process.

ATTENTION RESIDENTS PLANNING ON FULL DRIVEWAY REPLACEMENTS:
If a portion of your driveway apron has been removed as part of the City’s construction project and you are planning to have your own contractor install a full new driveway, please email Zach Pfieffer at zpfieffer@coonrapidsmn.gov with details (property address, timing of installation, etc.). The City will work with you to issue a credit for the work that would have been completed under our project and will direct the City’s Contractor to exclude your driveway apron from its restoration plans. 

2021 Street Reconstruction Project 21-2 – 3.6 miles of local streets (streets north of Coon Rapids Boulevard between Flamingo and Jay Streets north to 106th Avenue, Eagle Street to Avocet Street south of Egret Boulevard, and the neighborhood off Foley Boulevard between 95th and 97th Lanes) 

The Contractor for this project is Northdale Construction. The Contractor’s main contact is Kevin Topp at 320-493-7369. The City’s full-time project inspector is Jason Huebscher, who can be contacted any time to respond to specific questions or concerns. Jason can be reached at 763-767-6570 (office) or 612-709-2704 (cell).

Work planned for the week of June 28 includes asphalt base course paving in Phase 1 of Area 1 (streets including Flamingo Street, Grouse Street, Hummingbird Street, and a portion of 104th Avenue).

Asphalt pavement reclamation and remaining curb and driveway removals will take place next week on streets within Phase 2 of Area 1 (street including Ibis Street, Jay Street, 106th Avenue, and a portion of 104th Avenue). All driveways will be backfilled with gravel to maintain access to properties.

Work in Area 3 (streets east of Foley Boulevard and north of TH 610 up to 97th Lane) next week includes preparation for permanent watermain installations and temporary water service connections on streets including 97th Lane, 97th Avenue, Flintwood Street and a portion of 95th Lane.

ATTENTION RESIDENTS PLANNING ON FULL DRIVEWAY REPLACEMENTS:
If a portion of your driveway apron has been removed as part of the City’s construction project and you are planning to have your own contractor install a full new driveway, please email Jason Huebscher at jhuebscher@coonrapidsmn.gov with details (property address, timing of installation, etc.). The City will work with you to issue a credit for the work that would have been completed under our project and will direct the City’s Contractor to exclude your driveway apron from its restoration plans. 

Anoka County Projects – Foley Boulevard (CSAH 11) Railroad Bridge Overpass (between East River Road and Coon Rapids Boulevard)

To view the County’s project updates and subscribe to email notifications, click here: http://www.anokacounty.us/1578/Construction-Weekly 

For specific County project questions, contact Chris Osterhus, the County’s Construction Supervisor, at 763-324-3189. 

MnDOT Projects – Round Lake Boulevard Signal Replacements and Sidewalk Construction at Highway 10; Traffic Signal Replacements at TH 610 Exit Ramp and Coon Rapids Boulevard 

To view project updates for the Round Lake Boulevard Signal Replacement and Sidewalk Construction project, please click here.

Traffic signal replacement at the TH 610 Exit Ramp and Coon Rapids Boulevard is planned to take place July through September.

Watch our Street Reconstruction Videos!   

Watch the City’s street reconstruction videos to learn more about the process! The first addresses frequently asked questions, and the second demonstrates what the process will look like in a Coon Rapids neighborhood.

Visit our website to view them: www.coonrapidsmn.gov/843/Street-Reconstruction

Report It
Share on Facebook
Share on Twitter
Share via Email

Published by the City of Coon Rapids, Minnesota * Copyright 2021
11155 Robinson Drive, Coon Rapids, MN 55433

Powered by
CivicSend - A product of CivicPlus